Apart Hotel “Panchev” is located in town of Byala. The form of the apartment building is chosen with set purpose – repetition to the sea motif “fishbone” what logically reminds for its locality. There is a good view to the coastal space as the town environment permit.
The building is designed with four floors and underground floor (parking lot and coffee house/bar). There are 5 apartments, 29 studios, 29 attic halls, 8 garages, 10 parking places. There is an outside parking lot for the costumers for maximum comfort.
The studios, one- and two-room apartments are located on every floor of the building. On the roof level is projected elliptic bar and the stairs protrude over the roof as a glass module.
Kind of completion
General for the building:
- reinforced concrete structure, roof – bitum tiles, outside thermal isolation – EPS and silicate plaster, on the inside – gypsum plaster board;
- balconies – granitogres;
- PVC windows and doors system;
- stairwall floor – granitogres, walls and ceiling – latex, light fixtures, light switches and plugs;
- elevators – inside elevators and a sceni elevator;
- swimming pools;
- inner doors – MDF, entry doors – armoured;
Kind of completion for each apartment - І:
General for the apartment: inside installations – cable TV, telephone, Internet.
Entrance Hall: floor – terra cotta; walls – latex; ceiling – latex.
WC and bathroom : floor – terra cotta; walls – ceiling high faience; ceiling – suspended ceiling; sanitary equipment – toilet bowl with a monoblock, a cupboard wash-basin or wash-basin with a plot, with a water mixing tap, a shower cabin or a bath-tub, a mirror; electric water-heater; accessories – a rack, towel ring, toilet paper stand, toilet brush; light fixtures.
Living room/Bedroom: floor – laminated parquet; walls – latex; ceiling – latex; air-conditioner in each room; inner window blinds;
Kitchen box : floor – terra cotta; walls – latex; ceiling – latex;
Kind of completion for each apartment - ІІ: furnishing is according to an applications or a client’s request;
Possibility to manage the apartments - under the terms of additional contract.
The building will be completed by 20th of April 2008.