18 November 2018   Register | Login
   
   
 
   
   
   
 
 
     
 
   Quick Search Minimize




Search

 
Print    
     
     
 
   Property Agent Minimize
Search All » Homes » Apartment in a complex » Property Details
  
D72MK
Apartment in a complex FOR SALE in Ravda
EUR
24900

  · place: Ravda
  · region: Burgas
  · total surface: 30 sq.m.
property location
 airport - 15 km
 bus - 0.250 km
 beach - 0.250 km

Villa Flora is located in the South zone of Ravda. It is registered as land property III-459 in the area 22B of the building regulation plan of the resort and has total surface area of 788 sqm.

The building is intended for seasonal use but it can function all year round. The residential area is developed mainly into one-room studio apartments where the living and sleeping area are part of a common space. There is also a small but functional kitchenette. A bathroom with a bath tub come as standard. On request, the living area may be adapted so as to have additional sleeping area in a 2+2 configuration in all apartments.

In addition to that there are a number of small apartments with one or two bedrooms.

The top two floors will be developed into 8 open space maisonette-type apartments with an internal staircase leading to the upper level where the one or two bedrooms are situated.

All apartments, including the studio-type apartments, have their own terraces.

The construction is monolithic – concrete and steel, using a system of construction that is based on a beamless structure. Ceramic bricks will be used for the walls, which will be protected from the elements on the outside by the necessary thermo-insulation, in conformity with current standards. The internal walls will be treated with fine machine plastering and latex-painted. The facades will be formed by using mineral hydro-insulation materials, stone encasing, metal and other materials which blend with the architectural design. The joinery will be from PVC with thermo-material which will contribute to the environmentally friendly nature of the building. The necessary communication and security systems, installations of cable TV and internet, as well as air-conditioning systems are incorporated into the design.

The access to the plot is through the security-attended entrance.

The garden will be landscaped. There is a swimming pool, which is surrounded by a recreational area with sunbeds and umbrellas. Outside the plot boundaries, there is open-air parking for 8 cars.

Technical specifications

Surface of the plot

788 sqm

Built-up area

302  sqm

Total built-up area

1 372  sqm

Studio-type apartments

23

One bedroom apartments

5

Maisonette-type apartments with one bedroom

6

Maisonette-type apartments with two bedrooms

2

Total

36

Density of the building

38.4 %

Coefficient of intensity of the building (Kint)

1.75

 

 

Distance from Villa Flora to:

Approximetely in meters

The beach line of the complex /South beach/

250

Central pedestrian alley

50

The central bus stop, taxi rank, tourist train stop

250

Polyclinic

300

24 hour chemist shop

100

Police

350

Post office

300

Shops, supermarkets, outdoor market for goods/ food products

100 - 200

Banks

350

Money changing facilities

100 - 200

Tourist agents

100 - 400

The best value restaurants and bars

In the immediate neighborhood

The most popular discos and nightclubs in the complex

300-500

Aquapark Ravda

1 500

Sunny Beach Resort

5 000

Nessebar

3 000

International Airport Bourgas

15 km

 

Stages

Stage 1

16.11.2011
Turning the first sod

Stage 2

16.11.2011-20.12.2011
Active development of a foundation ditch. Terracing the terrain. Works on stacking a zero level. Moulding of the ground floor and the first plate.

Stage 3

20.12.2011 – 20.01.2012
Completion of the rough construction for floor 1 and floor 2.

Stage 4

20.01.2012 – 20.02.2012
Completion of the rough construction for floor 3 and floor 4.

Stage 5

20.02.2012 - 15.03.2012
Making of all barrage walls. Signing of the certificate for approving the construction of the building up to stage "rough construction works" /Act Pattern 14/.

Stage 6

15.03.2012 – 30.04.2012
Building up the roof construction.
Stacking electric, plumbing and others installations.
Finishing works inside the building.

Stage 7

Not later than 15.05.2012
Completing all finishing works. Final completion of the building. 

Stage 8

15.05.2012 – 30.05.2012
Definite completion of the vertical planning of the building.

Stage 9

30.05.2012
Delivering the apartments to their owners. Organization activities to prepare the exploitation of the building site for the summer tourist season.

Stage 10

30.06.2012

Signing of Act Pattern 15.

Stage 11

30.08.2012
Issuing a Certificate for the utilization of the building site /Act Pattern 16/.

Contact Us:
Send

Published on: 08 November 2011
Last modified: 12 July 2012